East Herts Surfacing Services

Delivering expert tarmac, resin, and block paving solutions across East Herts and beyond.

/
/
/
/
/
/
/
/
/

Braintree Hospital Road Resurfacing Project

Project Overview

East Herts Surfacing Ltd recently completed essential resurfacing works at Braintree Hospital to improve the condition, safety, and longevity of the site’s internal access roads and circulation routes.

The project involved planing off the existing worn surface and installing a new 40mm layer of 10mm surface course asphalt throughout the designated areas. The works were carefully coordinated to minimise disruption within the active hospital environment while maintaining safe access for staff, visitors, and service vehicles.

Scope of Work

The project commenced with the mechanical planing of the existing carriageway surface to a depth of 40mm. This process removed the aged top layer and prepared a suitable base for the new surfacing material.

Following preparation, a new 40mm layer of 10mm surface course asphalt was machine laid across the roadway. The newly installed surface was then compacted to specification, creating a smooth, durable finish capable of accommodating daily traffic demands.

Attention was given to maintaining consistent levels throughout the site, ensuring seamless transitions between existing kerbs, pedestrian walkways, parking areas, and access points.

Challenges & Solutions

One of the primary challenges of the project was carrying out resurfacing works within a live healthcare environment where access for hospital staff, patients, deliveries, and emergency services had to be maintained at all times.

Careful planning and traffic management measures were implemented to ensure the works progressed safely and efficiently. The surfacing team coordinated operations to minimise disruption while maintaining safe movement throughout the site.

By utilising modern surfacing equipment and experienced operatives, the project was completed efficiently, delivering a high-quality finish across all treated areas while meeting the required programme schedule.

Final Result

The completed resurfacing works have significantly improved the appearance and performance of the hospital’s internal road network. The new 10mm surface course provides a smooth, uniform finish that enhances both vehicle comfort and site presentation.

The upgraded surface offers improved durability and long-term resistance to daily traffic movements, helping to reduce future maintenance requirements while supporting safe and reliable access throughout the hospital grounds.

This project demonstrates East Herts Surfacing Ltd’s ability to deliver high-quality resurfacing solutions in operational environments, combining careful planning, precision workmanship, and professional project management to achieve lasting results.

Let us help you get your project started.

Contact us

    Cart (0 items)